OPTIMIZATION PRODUCTION CAPACITY USING VALUE STREAM MAPPING AND FLEXSIM IN UMKM X

Authors

  • Chezia Anandha Utama Universitas Duta Bangsa Surakarta
  • Cahyani Windarto Universitas Duta Bangsa Surakarta
  • Febrina Agusti Universitas Duta Bangsa Surakarta

DOI:

https://doi.org/10.47701/vgpw4j66

Keywords:

Bottleneck, Capacity Optimization, FlexSim, Bag MSME, Value Stream Mapping

Abstract

Micro-scale bag manufacturing businesses often face
challenges regarding the management of manual
production systems, leading to workflow imbalances. This
study focuses on a bag-making MSME in Sukoharjo that
operates on a made-to-order basis with a single-operator
setup. The primary issue is a critical bottleneck at the
pattern-making stage, which consumes up to three hours—
equivalent to 37.5% of the total daily production time for a

single custom bag. This results in a buildup of Work-in-
Process (WIP) inventory and reduced production flow

efficiency. The study aims to identify the production process

flow, pinpoint bottleneck locations, and design simulation-
based improvement scenarios to optimize production

capacity. The methodology integrates Value Stream
Mapping (VSM)—to map material and information flows at
a macro level—with FlexSim software to dynamically and
stochastically simulate manual processing time variability.
The proposed improvement strategy focuses on a low-cost,
high-impact approach through managerial interventions in
workload management (line balancing), avoiding the need
for significant investment in physical assets. The digital
simulation results from FlexSim are expected to provide a
realistic visualization for minimizing work queues,
increasing operator utilization, and maximizing daily
production output in a manner that ensures the operational
sustainability of the MSME.

References

Anwar, S., & Setiawan, A. (2022). Penerapan Value Stream Mapping untuk Peningkatan

Efisiensi Waktu Proses Produksi pada Industri Konveksi. Jurnal Teknik Industri,

23(1), 45-56.

Ardiansyah. (2024). Analisis Antrean dan Optimasi Lini Produksi Konveksi Pakaian

Menggunakan Simulasi FlexSim. Jurnal Rekayasa Sistem Industri, 12(1), 34-45.

Bagus, & Syahputra. (2024). Simulasi FlexSim untuk Penyeimbangan Beban Kerja pada

Proses Assembly Industry Manufaktur. Jurnal Optimalisasi Sistem Industri, 23(2),

112-123.

Baldah, dkk. (2021). Penerapan Value Stream Mapping dan Standar Simbol VSM dalam

Pemetaan Aliran Produksi. Jurnal Teknik Industri, 10(1), 15-28.

Benedikta, A. O., & Sukarno, I. (2021). Penerapan Value Stream Mapping (VSM) untuk

Peningkatan Efisiensi Pengadaan Barang dan Gas. Jurnal Manajemen Logistik dan

Rantai Pasok, 4(2), 78-89.

Banks, J., Carson, J. S., Nelson, B. L., & Nicol, D. M. (2021). Discrete-Event System

Simulation (5th ed.). Pearson

Dewi. (2023). Peningkatan Utilitas Mesin Konveksi Melalui Simulasi Diskrit FlexSim dan

Penjadwalan Maintenance. Jurnal Teknologi Industri, 15(2), 90-101.

Fandy Ahmad, & Aditya, D. (2021). Reduksi Motion Waste Menggunakan Value Stream

Mapping di Industri Plastik. Jurnal Integrasi Sistem Industri, 8(1), 45-56.

Fauziah, & Hartono. (2023). Lean VSM dan Simulasi FlexSim untuk Mempercepat Lead

Time pada Industri Kerajinan Tas. Jurnal Industri Kreatif, 11(2), 67-78

Goldratt, E. M., & Cox, J. (2024). The Goal: A Process of Ongoing Improvement (4th ed.).

Routledge.

Hakim. (2022). Optimasi Urutan Proses Kerja Stasiun Pengeleman Menggunakan FlexSim

pada Home Industry Aksesoris. Jurnal Riset Teknik Industri, 7(1), 22-31.

Heizer, J., Render, B., & Munson, C. (2023). Operations Management: Sustainability and

Supply Chain Management (14th ed.). Pearson.

Hidayat. (2024). FlexSim Bottleneck Analysis in Mass Apparel Production Line.

International Journal of Industrial Engineering, 18(1), 101-112.

Ibrahim, M., & Al-Khafaji, A. (2020). Analysis of Seven Wastes Interrelationships in

Manufacturing Systems. Journal of Advanced Manufacturing Technology, 14(3),

205-216.

Kementerian Pariwisata dan Ekonomi Kreatif. (2023). Laporan Kinerja Subsektor Fashion

dan Ekonomi Kreatif Nasional. Kemenparekraf RI.

Kroeger, M., & Zaeh, M. F. (2022). Efficiency Evaluation in Manual Assembly Lines

Using Digital Twins. Procedia CIRP, 107, 435-440.

Kuncoro, A. (2023). Lean Manufacturing: Prinsip Pemetaan Aliran Nilai (VSM) Pada

Industri Kreatif. Erlangga.

Kurniawan. (2024). Pengurangan Work in Process Meja Potong Menggunakan Simulasi

FlexSim pada Industri Tas Custom. Jurnal Sistem Manufaktur, 19(2), 88-97.

Kurniawan, H., Utami, M. H., & Pranaditya, R. (2026). Digital Twin Simulation using

FlexSim Software for Line Balancing in Craft MSMEs. Journal of Industrial

Engineering and Management Studies, 14(1), 22-31.

Lestari, & Budiman. (2023). Evaluasi Utilitas Operator Menggunakan Simulasi FlexSim

pada Konveksi Seragam Kerja. Jurnal Teknologi dan Manajemen Industri, 16(1), 50-

61.

Maulana. (2019). Identifikasi Seven Wastes dan Usulan Perbaikan pada Lini Manufaktur.

Jurnal Optimasi Sistem Industri, 18(2), 130-141.

Nguyen, T., et al. (2022). Lean Six Sigma and FlexSim Simulation for Lead Time

Reduction in Textile Manufacturing. Computers & Industrial Engineering, 165, 107-

118.

Downloads

Published

2026-09-26