PRODUCTION FACILITY LAYOUT DESIGN USING SLP AND BLOCPLAN METHODS AT ANGGUN BAKERY MSME
DOI:
https://doi.org/10.47701/qgxxsq70Keywords:
Facility layout, Systematic Layout Planning (SLP), BLOCPLAN, material flow, lead timeAbstract
Anggun Bekery, a small and medium-sized enterprise
(SME), which produces sweet bread and donuts, still has an
inefficient layout, resulting in overlapping flows, back- and-
forth movements, long material transfer distances, and
longer production times. This study aims to redesign the
production facility using the Systematic Layout Planning
(SLP) and BLOCPLAN methods to improve material flow
efficiency at Anggun Bakery.
This research was conducted through observation,
interviews, and measurements of the production area. The
analysis included identifying the existing layout, developing
an Operation Process Chart (OPC), calculating movement
distances using the rectilinear method, constructing an
Activity Relationship Chart (ARC), an Activity relationship
Diagram, and designing proposed layout using BLOCPLAN
software. The evaluation was conducted by comparing
material movement distances and production lead times
before and after the layout improvement.
The study found that the proposed layout was able to
eliminate crossing flow and backtracking, as well as reduce
material movement distance from 66 meters to 37 meters
(43,94), and production lead time from 72,25 minutes to
56,25 minutes per product (22,42). These results indicate
that the SLP and BLOCPLAN methods are effective in
increasing the efficiency of the Anggun Bakery MSME
production facility layout.
References
Albar, R. Z. (2024). Perancangan Ulang Tata Letak Fasilitas Menggunakan Metode SLP
dan BLOCPLAN PROGRAM STUDI S1 TEKNIK INDUSTRI FAKULTAS TEKNIK.
Albar, R. Z. S. (2024). LANDASAN TEORI. 7–23.
Andhieta et all. (2025). Jurnal Taguchi. 593–603.
Bayu, A., Yanto, H., Abimanyu, R., Fauzi, A., & Indriyani, N. (2024). Tata Letak Fasilitas
Pabrik Menggunakan Metode Systematic Layout Planning ( SLP ) Pada PT Tesena
Inovindo. 5(2), 53–60.
Hanjaya, T. J., Susanto, N., Industri, D. T., Teknik, F., & Diponegoro, U. (2024). USULAN
PERBAIKAN TATA LETAK AREA PROSES WARPING DENGAN METODE
KONVENSIONAL BERBASIS 5S ( STUDI KASUS : PT DUNIA SETIA SANDANG
ASLI TEKSTIL 4 ).
Immanuel, J., Santoso, A., & Hartono, M. (2023). Analisis perancangan tata letak fasilitas
di perusahaan XYZ produksi kedelai dengan systematic layout planning Analysis of
facility planning at XYZ company production soybean with systematic layout
planning. 4(November), 250–261. https://doi.org/10.37373/jenius.v4i2.555
Indriyanto, R. W. H. & R. (2024). ANALISIS PERANCANGAN ULANG TATA LETAK
FASILITAS LANTAI PRODUKSI MENGGUNAKAN METODE SLP ( SYSTEMATIC
LAYOUT PLANNING ). 19(2), 181–193.
Kurniadi, D., & Pratama, A. P. (2022). Relayout tata letak fasilitas produksi untuk
meminimalisasi material handling di pabrik tahu tradisional pangkalan. 22, 75–83.
Lubis, A. H. (2022). METODE SYSTEMATIC LAYOUT PLANNING DI CV SUKA
SKRIPSI OLEH : ANDRI HADI LUBIS FAKULTAS TEKNIK UNIVERSITAS
MEDAN AREA MEDAN Diajukan sebagai Salah Satu Syarat untuk Memperoleh
Gelar Sarjana di Fakultas Teknik Program Studi Teknik Industri Universitas Medan.
Maulidah, P Anggela, I. (2022). REDESIGN TATA LETAK FASILITAS MENGGUNAKAN
METODE ACTIVITY RELATIONSHIP CHART DAN ALGORITMA BLOCPLAN
PADA PABRIK XYZ. 6(2), 78–82.
Mudhofar, M., Suroso, H. C., Rahadian, A. R., & Sholekhah, L. N. (2023). Perancangan
Ulang Tata Letak Fasilitas Produksi dengan Menggunakan Metode Systematic
Layout Planning dan CRAFT untuk Mengurangi Biaya Material Handling pada PT
. Prima Daya Teknik. Senastitan Iii.
Pradana, G. R. (2025). PERANCANGAN TATA LETAK LANTAI PRODUKSI
MENGGUNAKAN METODE SYSTEMATIC LAYOUT PLANNING PADA
DEPARTEMEN PRODUKSI FAKULTAS TEKNOLOGI INDUSTRI UNIVERSITAS ISLAM INDONESIA.
Rahmawanti, G., Mellisa, F., & Putri, Y. (2026). Perbaikan Tata Letak IMKM Bengkel Las
Jaya di Kota Dumai Menggunakan Metode Systematic Layout Planning ( SLP ) dan
Grafik.
Saputra, M. A., Rachmawaty, D., & Karima, H. Q. (2022). MATRIK Jurnal Manajemen
dan Teknik Industri-Produksi Perancangan Tata Letak Fasilitas Pada UMKM
Sepatu “ Prohana ” menggunakan Systematic Layout Planning. XXIII(1).
https://doi.org/10.350587/Matrik
Sibarani, A. A., Syahrullah, Y., Setyaningrum, D. T., & Prasetyo, M. A. (2024). Usulan
Tata Letak Fasilitas dengan Menggunakan Metode Systematic Layout Planning (
SLP) Pada Departemen Coumpound Industri Manufaktur Sepatu. XVIII(3), 353–
366.
Simanjuntak, R. A., Asih, E. W., & Winardi, F. (2022). USULAN PERBAIKAN TATA
LETAK FASILITAS PRODUKSI KAYU OLAHAN MENGGUNAKAN METODE
ACTIVITY RELATIONSHIP CHART , CRAFT DAN FROM TO. November, 10–17.
Suhandinata, Y. (2023). Perancangan Ulang Tata Letak Fasilitas Produksi dengan Metode
from to Chart pada Perusahaan Meubel di CV . Esa Banyuwangi. 1(1).
Yulia, A., Nurdziky, I., & Oktaria, F. (2022). Perancangan Ulang Tata Letak Fasilitas
Pabrik PD Ayam Ras dengan Metode Systematic Layout Planning ( SLP ). 11(2),
121–128.