PRODUCTION FACILITY LAYOUT DESIGN USING SLP AND BLOCPLAN METHODS AT ANGGUN BAKERY MSME

Authors

  • Fitria Nur Azizah Wijaya Suta Universitas Duta Bangsa Surakarta
  • Febrina Agusti Universitas Duta Bangsa Surakarta
  • Pitoyo Amrih Universitas Duta Bangsa Surakarta

DOI:

https://doi.org/10.47701/qgxxsq70

Keywords:

Facility layout, Systematic Layout Planning (SLP), BLOCPLAN, material flow, lead time

Abstract

Anggun Bekery, a small and medium-sized enterprise
(SME), which produces sweet bread and donuts, still has an

inefficient layout, resulting in overlapping flows, back- and-
forth movements, long material transfer distances, and

longer production times. This study aims to redesign the
production facility using the Systematic Layout Planning
(SLP) and BLOCPLAN methods to improve material flow
efficiency at Anggun Bakery.
This research was conducted through observation,
interviews, and measurements of the production area. The
analysis included identifying the existing layout, developing
an Operation Process Chart (OPC), calculating movement
distances using the rectilinear method, constructing an
Activity Relationship Chart (ARC), an Activity relationship
Diagram, and designing proposed layout using BLOCPLAN
software. The evaluation was conducted by comparing
material movement distances and production lead times
before and after the layout improvement.
The study found that the proposed layout was able to
eliminate crossing flow and backtracking, as well as reduce
material movement distance from 66 meters to 37 meters
(43,94), and production lead time from 72,25 minutes to
56,25 minutes per product (22,42). These results indicate
that the SLP and BLOCPLAN methods are effective in
increasing the efficiency of the Anggun Bakery MSME
production facility layout.

References

Albar, R. Z. (2024). Perancangan Ulang Tata Letak Fasilitas Menggunakan Metode SLP

dan BLOCPLAN PROGRAM STUDI S1 TEKNIK INDUSTRI FAKULTAS TEKNIK.

Albar, R. Z. S. (2024). LANDASAN TEORI. 7–23.

Andhieta et all. (2025). Jurnal Taguchi. 593–603.

Bayu, A., Yanto, H., Abimanyu, R., Fauzi, A., & Indriyani, N. (2024). Tata Letak Fasilitas

Pabrik Menggunakan Metode Systematic Layout Planning ( SLP ) Pada PT Tesena

Inovindo. 5(2), 53–60.

Hanjaya, T. J., Susanto, N., Industri, D. T., Teknik, F., & Diponegoro, U. (2024). USULAN

PERBAIKAN TATA LETAK AREA PROSES WARPING DENGAN METODE

KONVENSIONAL BERBASIS 5S ( STUDI KASUS : PT DUNIA SETIA SANDANG

ASLI TEKSTIL 4 ).

Immanuel, J., Santoso, A., & Hartono, M. (2023). Analisis perancangan tata letak fasilitas

di perusahaan XYZ produksi kedelai dengan systematic layout planning Analysis of

facility planning at XYZ company production soybean with systematic layout

planning. 4(November), 250–261. https://doi.org/10.37373/jenius.v4i2.555

Indriyanto, R. W. H. & R. (2024). ANALISIS PERANCANGAN ULANG TATA LETAK

FASILITAS LANTAI PRODUKSI MENGGUNAKAN METODE SLP ( SYSTEMATIC

LAYOUT PLANNING ). 19(2), 181–193.

Kurniadi, D., & Pratama, A. P. (2022). Relayout tata letak fasilitas produksi untuk

meminimalisasi material handling di pabrik tahu tradisional pangkalan. 22, 75–83.

Lubis, A. H. (2022). METODE SYSTEMATIC LAYOUT PLANNING DI CV SUKA

SKRIPSI OLEH : ANDRI HADI LUBIS FAKULTAS TEKNIK UNIVERSITAS

MEDAN AREA MEDAN Diajukan sebagai Salah Satu Syarat untuk Memperoleh

Gelar Sarjana di Fakultas Teknik Program Studi Teknik Industri Universitas Medan.

Maulidah, P Anggela, I. (2022). REDESIGN TATA LETAK FASILITAS MENGGUNAKAN

METODE ACTIVITY RELATIONSHIP CHART DAN ALGORITMA BLOCPLAN

PADA PABRIK XYZ. 6(2), 78–82.

Mudhofar, M., Suroso, H. C., Rahadian, A. R., & Sholekhah, L. N. (2023). Perancangan

Ulang Tata Letak Fasilitas Produksi dengan Menggunakan Metode Systematic

Layout Planning dan CRAFT untuk Mengurangi Biaya Material Handling pada PT

. Prima Daya Teknik. Senastitan Iii.

Pradana, G. R. (2025). PERANCANGAN TATA LETAK LANTAI PRODUKSI

MENGGUNAKAN METODE SYSTEMATIC LAYOUT PLANNING PADA

DEPARTEMEN PRODUKSI FAKULTAS TEKNOLOGI INDUSTRI UNIVERSITAS ISLAM INDONESIA.

Rahmawanti, G., Mellisa, F., & Putri, Y. (2026). Perbaikan Tata Letak IMKM Bengkel Las

Jaya di Kota Dumai Menggunakan Metode Systematic Layout Planning ( SLP ) dan

Grafik.

Saputra, M. A., Rachmawaty, D., & Karima, H. Q. (2022). MATRIK Jurnal Manajemen

dan Teknik Industri-Produksi Perancangan Tata Letak Fasilitas Pada UMKM

Sepatu “ Prohana ” menggunakan Systematic Layout Planning. XXIII(1).

https://doi.org/10.350587/Matrik

Sibarani, A. A., Syahrullah, Y., Setyaningrum, D. T., & Prasetyo, M. A. (2024). Usulan

Tata Letak Fasilitas dengan Menggunakan Metode Systematic Layout Planning (

SLP) Pada Departemen Coumpound Industri Manufaktur Sepatu. XVIII(3), 353–

366.

Simanjuntak, R. A., Asih, E. W., & Winardi, F. (2022). USULAN PERBAIKAN TATA

LETAK FASILITAS PRODUKSI KAYU OLAHAN MENGGUNAKAN METODE

ACTIVITY RELATIONSHIP CHART , CRAFT DAN FROM TO. November, 10–17.

Suhandinata, Y. (2023). Perancangan Ulang Tata Letak Fasilitas Produksi dengan Metode

from to Chart pada Perusahaan Meubel di CV . Esa Banyuwangi. 1(1).

Yulia, A., Nurdziky, I., & Oktaria, F. (2022). Perancangan Ulang Tata Letak Fasilitas

Pabrik PD Ayam Ras dengan Metode Systematic Layout Planning ( SLP ). 11(2),

121–128.

Downloads

Published

2026-09-26