PERANCANGAN PERAWATAN DAN PENJADWALAN PREVENTIVE MAINTENANCE MESIN STITCHING BERBASIS METODE RELIABILITY CENTERED MAINTENANCE (RCM) DI CV MADYOTOMO

PERANCANGAN PERAWATAN DAN PENJADWALAN PREVENTIVE MAINTENANCE MESIN STITCHING BERBASIS METODE RELIABILITY CENTERED MAINTENANCE (RCM) DI CV MADYOTOMO

Authors

  • Lourdes Alice Soares Costa Program Studi Teknik Industri, Fakultas Sains dan Teknologi, Universitas Duta Bangsa Surakarta
  • Febrina Agusti Program Studi Teknik Industri, Fakultas Sains dan Teknologi, Universitas Duta Bangsa Surakarta
  • Indah Wahyu Utami Program Studi Teknik Industri, Fakultas Sains dan Teknologi, Universitas Duta Bangsa Surakarta

DOI:

https://doi.org/10.47701/8c1a8215

Keywords:

Preventive Maintenance, Reliability Centered Maintenance (RCM), FMEA, MTTF, MTTR, Downtime, Stitching Machine

Abstract

This study intends to create a system for maintenance and a schedule for preventive maintenance for the sewing machine at CV Madyotomo by utilizing the Reliability Centered Maintenance (RCM) approach. The main problem is the high downtime of the Müller Martini 321 stitching machine, which reached 20,114 minutes during January–June 2025, resulting in a production capacity loss of 1,005,711 books and an estimated financial loss of around Rp50,285,550. The research method involved identifying critical components through observation, interviews, and Failure Mode and Effect Analysis (FMEA), followed by the calculation of Mean Time To Failure (MTTF), Mean Time To Repair (MTTR), and failure distribution using Minitab 19 software. The results indicate four critical components with the highest Risk Priority Number (RPN), namely bearing (240), v-belt (189), shaft gear (175), and support gear (160). Based on the analysis, the optimal preventive maintenance intervals are bearing every 18 days, v-belt every 21 days, shaft gear every 21 days, and support gear every 28 days, with MTTF values ranging from 693 to 1,174 hours and MTTR averaging 4–6 hours. The implementation of an RCM-based preventive maintenance strategy is proven to reduce downtime, improve machine reliability, and ensure production efficiency, thus providing a guideline for printing companies in formulating measurable, effective, and efficient maintenance policies.

References

Akbar Waluyo, A., & Widyaningrum, D. (2023). Perbaikan Sistem Perawatan Mesin Forming dengan Metode FMECA dan RCM Berdasarkan Analisis OEE Pada PT XYZ. Jurnal Serambi Engineering, 8(4), 7281–7290. https://doi.org/10.32672/jse.v8i4.6862

Hermawan, A., & Akmal, R. (n.d.). PENERAPAN METODE OVERALL EQUIPMENT EFFECTIVENESS (OEE) DAN FAILURE MODE AND EFFECT ANALYSIS (FMEA) PADA MESIN ADHESIVE DI PT. ASIA CHEMICAL INDUSTRY. Jurnal Ilmiah Teknik Dan Manajemen Industri Jurnal Taguchi, 2(2), 2022–2197. https://doi.org/10.46306/tgc.v2i2

Intan Rahmawati, N., Cahya Karmelia, M., & Survia, D. (2024). ANALISIS STRATEGI BISNIS PERCETAKAN BUKU CV JRM PRODUCTION. Oktober, 4(2), 553–562. https://doi.org/10.25105/jet.v4i2.20236

Junaidi Junaidi, & Agus Sujatmiko. (2024). Analisis Perawatan Mesin Bubut Baoji 1660A dengan Metode Reliability Centered Maintenance (RCM). Mars : Jurnal Teknik Mesin, Industri, Elektro Dan Ilmu Komputer, 2(4), 259–272. https://doi.org/10.61132/mars.v2i4.264

Pratiwi, W. C., Studi, P., Industri, T., Sains, F., Teknologi, D. A. N., Islam, U., Sultan, N., & Kasim, S. (2024). Diajukan Sebagai Salah Satu Syarat Untuk Memperoleh Gelar Sarjana Teknik Pada Program Studi Teknik Industri Fakultas Sains dan Teknologi Universitas Islam Negeri Sultan Syarif Kasim Riau Disusun Oleh:

RASYID, A., Mokodompit, A., & Aprilia, N. I. (2020). Perencanaan Pemeliharaan Mesin First Press Expeller P03 Dengan Menggunakan Metode Rcm Di Pt. Multi Nabati Sulawesi. Jurnal Ekonomi, Sosial & Humaniora, 2(05), 104-110.

Rizal, A., Yudhanegara, D., & Putri, P. K. B. (2023). Perencanaan Jadwal Perawatan Pencegahan Mesin Sliting Dengan Metode RCM (Realibility Centered Maintenance) Di PT. XYZ. Industrika: Jurnal Ilmiah Teknik Industri, 7(3), 276-284.

Sastriawan, A. (2024). Penjadwalan Pemeliharaan Mesin Produksi Menggunakan Reliability Centered Maintenance. Jurnal Teknologi, 14(1), 26–35. https://doi.org/10.35134/jitekin.v14i1.113

Sofyan, A., Utami, I. W., & Buwono, R. I. (2023). PERANCANGAN PERAWATAN MESIN CETAK OFFSET DENGAN PENDEKATAN RELIABILITY CENTERED MAINTENANCE (RCM) (STUDI KASUS PADA CV MADYOTOMO JAWA TENGAH) (Studi Kasus : CV Madyotomo). 1(3), 241–252.

Downloads

Published

2025-11-02

How to Cite

PERANCANGAN PERAWATAN DAN PENJADWALAN PREVENTIVE MAINTENANCE MESIN STITCHING BERBASIS METODE RELIABILITY CENTERED MAINTENANCE (RCM) DI CV MADYOTOMO: PERANCANGAN PERAWATAN DAN PENJADWALAN PREVENTIVE MAINTENANCE MESIN STITCHING BERBASIS METODE RELIABILITY CENTERED MAINTENANCE (RCM) DI CV MADYOTOMO. (2025). Journal Science Innovation and Technology (SINTECH), 6(1), 32-44. https://doi.org/10.47701/8c1a8215