Waste Identification In The Production Process PTC Ceramic Heating Element With Lean Manufacturing Approach At CV. Sulis Keramik

Authors

  • Arista Maylani Universitas Duta Bangsa Surakarta
  • Febrina Agusti Universitas Duta Bangsa Surakarta
  • Brillian Nur Diansari univer

DOI:

https://doi.org/10.47701/icohetech.v5i1.4239

Keywords:

Lean Manufacturing, Waste, Value Stream Mapping, VALSAT, Waste Assessment Model

Abstract

A firm called CV. Sulis Keramik makes parts for mosquito mats; these parts come in the shape of PTC heating elements. A kind of positive temperature coefficient thermistor used in heating applications is the ptc heating element. There are still many different waste indicators throughout the production process, which lowers the process's efficacy and efficiency. Defects with a 10% defect rate are among the main issues. Furthermore, there exist other indicators of waste associated with waiting times, transportation, and other wastes. With the use of lean manufacturing techniques, this project seeks to eradicate waste from CV Sulis Keramik ptc heating element production process. Value stream mapping in its current state, waste assessment models, value stream analysis tools, production system improvement, and designing future value stream mapping were all shown in the research's first stage.

References

Asrul, F., & Januar, K. (2023). Implementasi Lean ManufacturingUntuk Mengurangi WastePada Proses Produksi Sirup Markisa. 01(01), 23–29.

Irawan, A., & Putra, B. I. (2021). Jurnal SENOPATI. 1–10.

Miftakhul, J., & Dewi, S. (2021). Analisis Penerapan Lean Manufacturing untuk Mereduksi Over Production Waste Menggunakan Value Stream Mapping dan Fishbone Diagram.

Naziihah, A., Arifin, J., & Nugraha, B. (2022). Identifikasi Waste Menggunakan Waste Assessment Model ( WAM ) di Warehouse Raw Material PT . XYZ Identification of Waste Using Waste Assessment Model ( WAM ) in the Warehouse Raw Material PT . XYZ. 6(1). https://doi.org/10.35194/jmtsi.v6i1.1599

Nurdiansyah, D., Fatimah, S. N., Nurwiyanti, H., & Fauzi, M. (2022). Usulan Efisiensi Waste Proses Produksi Bed Sheet di PT ABC Menggunakan Metode Value Stream Mapping. Jurnal Ilmiah Statistika Dan Ekonometrika, 1(1), 93–106.

Restuningtias, G., Sudri, N. M., Widianty, Y., Studi, P., Industri, T., Puspiptek, J. R., Selatan, K. T., & Time, L. (2020). Peningkatan Efisiensi Proses Produksi Benang dengan Pendekatan Lean Manufacturing Menggunakan Metode WAM dan VALSAT di PT . XYZ The Efficiency Improvement of Yarn Production Process by Lean Manufacturing Approach with WAM and VALSAT Methods at PT .Peningk. 27–32.

Sarjono, & Jasan, S. (2021). Meminimasi Waste Pada Proses Pembuatan Oil Seal Dengan Pendekatan Lean Manufacturing (Studi Kasus Proses Produksi Oil Seal Line Sim Di Pt. Nok Indonesia). KOCENIN SERIAL KONFERENSI, Webinar Nasiional PAKAR KE 4, 1(1), 1–6.

Satria, T., & Yuliawati, E. (2022). Perancangan Lean Manufacturing dengan Menggunakan Waste Assessment Model ( WAM ) dan VALSAT untuk Meminimumkan Waste ( Studi Kasus?: PT . XYZ ). 55–63.

Trisnanda, H. (2020). Eliminasi pemborosan pada sistem produksi menggunakan pendekatan lean manufacturing di pt perkebunan tambi tugas akhir.

Yuri Delano Regent, M., & Ginting, H. (2021). Pipe Intake Production System Improvement with Lean Manufacturing at PT . WIKONI. Journal of Integrated System, 4(1), 1–16.

Downloads

Published

2024-09-24