[1]
“PERANCANGAN PERAWATAN DAN PENJADWALAN PREVENTIVE MAINTENANCE MESIN STITCHING BERBASIS METODE RELIABILITY CENTERED MAINTENANCE (RCM) DI CV MADYOTOMO: PERANCANGAN PERAWATAN DAN PENJADWALAN PREVENTIVE MAINTENANCE MESIN STITCHING BERBASIS METODE RELIABILITY CENTERED MAINTENANCE (RCM) DI CV MADYOTOMO”, SINTECH, vol. 6, no. 1, pp. 32–44, Nov. 2025, doi: 10.47701/8c1a8215.