1.
Industrial WORKLOAD ANALYSIS PADA OPERATOR MESIN BENDING SAFAN DARLEY DAN MESIN VACUUM CNC GEISS AG DENGAN METODE FTE (FULL TIME EQUIVALENT) DI PT. LAKSANA BUS MANUFAKTUR : WORKLOAD ANALYSIS ON SAFAN DARLEY BENDING MACHINE OPERATORS AND GEISS AG VACUUM CNC MACHINES USING THE FTE (FULL TIME EQUIVALENT) METHOD AT PT. LAKSANA BUS MANUFACTURING. HUBISINTEK [Internet]. 2024 Jan. 18 [cited 2026 May 27];4(1). Available from: https://ojs.udb.ac.id/HUBISINTEK/article/view/3538